Day 1 we got timber from our sponsors and are looking at the final designs, we have been working on them for about 3 months, it's finally time for the build
Starting the 1st foundation
Corner connection test of foundation and beams
Day 2
Cutting Metal plates for steel rods to handle sheer weights
Foundation and off cuts table :D
Foundation 2
Day 3
Base added to foundations and cross beams notched and tested
In the original bridge they used metal plates we used duct tape :D
Load tests and decking
Crossbracing
It works !
Day 4
Fixing Second foundation and tests
Zigzags and decking conversations
Possible location
Day 5
The site
The build continues with screwing taping and lots of holding
Day 6
Finishing taping and installing the zigzag members
Decking tests and finalisation talks
Day 7
We managed to make it into 5 parts that connect at certain points
Metal rods are here for threading
Plates are punched with holes for rods
Transport
Connection
Connected
Day 8
It's all coming together
Curve members for decking and finishing
Rods and plates are inserted, we have been using props to hold the bridge up and with the Rods we won't need to
One small step for man
Day 9
On site
One giant leap for us :D head of school takes 1st steps across
My 1st walk
Final
Next stop Eco build !
At ecobuild 2012
Copyright By anticor11.org
Excuse for that I interfere... I understand this question. Let's discuss.
Sorry for interfering ... But this topic is very close to me. Write to PM.
This information is true
I apologize for interfering ... I can find my way around this question. Is ready to help.
I can not participate now in discussion - it is very occupied. But I will be released - I will necessarily write that I think.
Thanks for an explanation, I too consider, that the easier, the better...